Solar Cell Codes and Rooftop Quote Checks
Summary
Ask for the module model, its documented cell model and the applicable list entry before accepting a rooftop quote or substitution. Two solar quotes can name the same panel brand and still offer different models. When the choice depends on the cells inside the module, ask the installer to show how the quoted panel connects to the manufacturer's cell record. A new ministry naming format makes those records easier to compare where ALMM List II applies. Start with the two model numbers The module is the finished panel on the roof.
Published on

A rooftop panel’s rear housing accompanies the buyer’s check linking a quoted module to its documented solar cells
Credit: Illustrative image
Inline Intelligence
Two solar quotes can name the same panel brand and still offer different models. When the choice depends on the cells inside the module, ask the installer to show how the quoted panel connects to the manufacturer's cell record. A new ministry naming format makes those records easier to compare where ALMM List-II applies.
Start with the two model numbers
The module is the finished panel on the roof. The cell is a component inside it. India's Approved List of Models and Manufacturers uses List-I for modules and List-II for cells. A model number on the panel or quote will normally identify the module. To connect it to the underlying cell model, request evidence from the installer or module supplier rather than trying to read the cell identity from the panel brand.
The 25 November 2026 office memorandum sets a brand name plus a mandatory 12-character base for covered solar cell models. The ministry allows suffixes for manufacturers to specify extra details. The code includes a technology field and an efficiency band. A matching cell code can help identify the stated cell. Roof orientation, shade, the module specification and system design are still needed when comparing expected electricity generation.
Ask for a dated cross-reference during the changeover
New applications lodged after the memorandum must use the standard. The memo gives three months for pending applications and models that were already enlisted. During that transition, a quote and a revised list may use different names. Request a written mapping from the original cell model to the updated entry. Record the list revision and date. The mapping is also worth retaining if a replacement is offered after you accept a quote.
For a project where List-II matters, check the project-specific terms and separately confirm any scheme or electricity distribution company conditions. Domestic sourcing and subsidy eligibility can depend on more than one rule. Vantage discussed the distinction between cell and upstream wafer lists in earlier coverage -> ALMM List III What India’s Solar Wafer Rule Means.
What Rooftop Buyers Can Check
- Record the exact module model, panel count and watts per panel from the signed quote. Verify them against the manufacturer's datasheet.
- Request the specific cell-model record from the supplier if the cell determines compliance or a purchasing condition. Ask for written confirmation that it applies to the quoted module.
- Compare the model with the dated ministry list and check the applicable scheme or distribution company documents for your installation.
- Document any proposed substitution, including the replacement model and the revised total watts, before accepting a change.
If the paperwork uses an old name during the three-month transition, consider asking the supplier for the dated cross-reference. If the price depends on a rebate or specific equipment requirement, consider checking the applicable rules and replacement language before comparing quotes.
In a hypothetical November 2026 example, ten 550 W modules provide 5.5 kW of rated DC capacity. Substituting ten 500 W modules gives 5.0 kW. At the same ₹2.50 lakh total price, the quoted cost rises from about ₹45,455 per kW to ₹50,000 per kW, around 10%. Rated capacity alone cannot forecast generation. Monitor new List-II revisions, written substitution confirmations and your project-specific scheme documents.
FAQ
Does the new code go on the module itself?
The memo sets out the naming of covered solar cell models. Ask for a supplier record that links the cell model to the finished module you are buying.
Why can a code have more than 12 characters?
Manufacturers can append extra details as long as the first 12 characters follow the standard.
What if my two documents use different names?
Ask for a dated written mapping and compare it with the applicable ministry list revision.
Does a cell efficiency band predict rooftop production?
The band describes a cell attribute. Rooftop output also depends on the module, installation and local conditions.
Does the code establish whether I qualify for a subsidy?
Check the scheme and project requirements separately. The code helps identify a cell model.
Sources
Click an article title to view the source.
- MNRE Limits ALMM-II Solar Cell Model Identification Code to 12 Characters, published on 26 November 2026 in Mercom India.
- MNRE Mandates Standardised Nomenclature for Solar PV Cell Models Under ALMM List-II, published on 27 November 2026 in Energetica India.
- ALMM List-II 13th Revision, accessed on 27 November 2026 in MNRE.
- ALMM List III What India’s Solar Wafer Rule Means, published on 17 September 2026 in Vantage InSights.
Evidence Caveats
The memorandum governs naming for covered List-II models. Individual scheme eligibility, dispatch documents and model mappings require separate evidence. The example uses hypothetical prices and capacity.
In the attached forum discussion, share what a supplier can put in writing to make it easier to verify a proposed panel substitution.
Disclaimer
This is general editorial information. Verify procurement and eligibility requirements with the relevant programme, supplier and distribution company.

From TatvaOps
Solar & Energy Solutions
Considering rooftop solar?
Verified installers, subsidy support, and milestone-secured payments.
Free quotes · Verified contractors · tatvaops.com
Discuss this article
Join the conversation
Continue this discussion on Forums. A board named like this InSights article is filed under InSights.
More from Solar
US Tariff Exposure Checks for Indian Investors
Trace US sales, product exemptions and pricing pressure before judging how the Section 301 proposal could affect your portfolio.
Rooftop Solar Storage Costs and Buyer Checks
Compare storage and no-storage quotes using actual tariffs, usable battery capacity and realistic backup requirements.
Maharashtra Battery Storage and Home Backup
A 4,000 MWh grid storage approval gives Maharashtra a way to shift power between hours. Use your own outage log and critical load to assess whether home backup still makes sense.
Inline Intelligence
Key Insight Actions
Connected knowledge for Solar Regulation
Move between tutorials, discussions, Studio, and hubs without losing context.
Conclusion Intelligence
Was this helpful?
Let us know what you think